STF2080
model:STF2080
- category:Boom series
- Maximum lifting capacity:160T
- Tip load:3T
- Arm length:70M
- Free height:60M
Tower crane model: STF2080
Maximum boom length: 70m
Maximum boom length tip load: 3t
Maximum lifting weight: 160t
product description:
Maximum boom length: 70m
Maximum boom length tip load: 3t
Maximum lifting weight: 160t
Magnification: 6 times
Free height: 60m
Tower body: integral pin connection
Lifting mechanism: 150LFV270B Power: 162kW Rope capacity: 1200m
Luffing mechanism: 110DFV210BI Power: 123kW Luffing speed: 15°-85°4min
Slewing mechanism: 15RFCV Power: 2x15kW Slewing speed: 0-0.5rpm
Highlights:
1. The H-type standard section is matched with the large bottom frame, and the whole machine has high stability. The non-working self-locking state is designed to resist wind up to 10 grades of wind. ETI control technology, safe and efficient hoisting;
2. Lifting wire rope auxiliary winding device, luffing rod auxiliary installation device, integrated design of A-frame and luffing mechanism, low weight of slewing assembly, foldable bottom frame design, less transit trips, 45 hours fast tower erection , demolish the tower;
3. Fast magnification conversion, adjust the load table by replacing the arm end section, and realize the seamless switch between wind power construction and civil construction;
4. The square motor of the mechanism adopts new materials with high magnetic permeability, small moment of inertia, half of the braking distance, high efficiency, safety, light weight, and easy replacement and operation;
5. Leading the industry's original "safety brake", the output side low-speed safety brake is the first in the tower crane industry. It can independently and dynamically provide 1.5 braking power, and the braking distance is within 2 meters. It is equipped with a brake confirmation sensor to intelligently identify dangerous work. condition to achieve safe braking;
STF2080 quick-loading boom tower crane can fully cover the hoisting of wind turbines of 5MW and below. It integrates high-efficiency hoisting, convenient disassembly, fast transition and lower operating costs. The maximum installation and maintenance of ultra-high impeller height fans above 150m It fully meets the ultra-high construction requirements of fans. It is the special equipment for wind power hoisting with the best comprehensive performance on the market. It is a major innovation and breakthrough in domestic wind power construction technology. It effectively fills the industry gap of my country's tower crane installation fans. . It is suitable for construction of super-large bridges, ports, water conservancy and hydropower facilities, super high-rises, super-large high-structure projects, etc.